The Proof’s in the Satisfaction: Customers Praise IntelliFinishing’s Maintenance
At IntelliFinishing, we believe there’s no better indicator of success and positive results than the satisfaction and happiness of our valued customers.
While our decades of experience and industry-leading finishing systems set us apart, it’s all for naught if we can’t ensure that each and every system is operating up to our lofty standards far beyond initial installation.
Is friction tube technology more difficult to maintain? How much benefit is there when compared to traditional power and free finishing systems? To answer these questions and more, we’ll look at how a few of our customer’s describe their IntelliFinishing post-purchase maintenance experience.
Plant Manager – Construction Truck OEM, Kentucky, Powder
“In the two years we’ve been running, I think we’ve only had one failure on the track. A motor went out, but we keep a spare, and we had it changed out in less than an hour.
It’s honestly been eerily quiet compared to our old line. Initially, we had concerns about maintenance for friction tube technology and felt like there was risk for issues, but that hasn’t been the case.
For me, personally…
I think it’s underestimated how much of a difference there is between the systems (IntelliFinishing vs P&F) in terms of component wear and impact.
On continuous and P&F lines, the chains are always on, and the carriers are constantly engaging and disengaging.
With IntelliFinishing, everything accelerates and decelerates, so there isn’t impact loading on any of those components, and they only operate when needed.
It’s just a different ballgame on the maintenance front than it used to be for us.”
Special Projects Manager – Conveyor OEM, Arkansas, Powder
“We have over 100 drives on our current system – the original system had 96.
Although we have had a couple of motors go out, they are easy to change out – it takes less than 20 minutes. We usually keep three or four in stock.
Overall, we are very pleased with the system. We have had record growth each year since our start-up.”
Continuous Improvement Leader – Industrial HVAC Equipment OEM, North Carolina, Powder
“We have not had any maintenance concerns or problems.
Our maintenance department does perform scheduled PMs, and our system runs all three shifts five to six days a week with no issues.
The only thing I can think of in the five years that we have had an IntelliFinishing system is just keeping the wheels on the carriers that make contact with the aluminum rollers checked, as they will wear out, but that’s not a big deal.”
Owner – Custom Coater, Kansas, Liquid
(NOTE: This is a smaller system using belt drives, not chain drives as are used in heavier weight systems.)
“The maintenance on the motor itself is negligible. We have not replaced any of our motors since our installation in late 2015.
Obviously, the speed the motors are run at, along with the hours per day, will have an impact on this. We are running first shift, and our motors run no faster than 30fpm.
We have replaced belts on regular scheduled maintenance and have only had one time since 2015 when we had a belt completely fail and come apart. As the system is designed, however, we were able to cut the belt free and continue running on three belts.
We replaced the broken belt at a scheduled maintenance interval. … As with anything mechanical, things can fail, but we have found the equipment with the IntelliFinishing system to be pretty robust.
As long as you monitor the trolley wheels and the motor belts, the maintenance on the drive system will be very minimal and easily scheduled.”
Manufacturing Engineer – Paint – Major Heavy Equipment OEM, Arkansas, Liquid
“I am very pleased with the reliability of the IntelliFinishing system, and the motors have not been an issue for us ever since we installed a surge protector. That would be the only thing I would recommend to do.”
Engineer – Construction Equipment OEM, Kentucky, Powder
“I know there has been some maintenance involved in the carriers and conveyor, but it hasn’t been excessive.
I would just recommend that the design of the conveyor needs to keep maintenance in mind with their particular application. For instance, our carriers go through a shot blast, and there can be buildup of metal on the bearings.
This requires us to regularly remove the debris. We ended up modifying the design of the conveyor to accommodate how and where the maintenance team wanted to perform maintenance. I’d suggest polling the maintenance team during the design.
Our cycle time is relatively high at 20 minutes per station, so we were able to complete most maintenance tasks in-line without removing a carrier.”
Maintenance Technician, Engineer – Construction Equipment OEM, Kentucky, Powder
“To be honest, I think this system is easy to maintain. Changing out drive tubes and bearings is a breeze, and, depending on the configuration, it can take less than five minutes.
It does seem overwhelming, at first, with all of the motors, but we haven’t had any issues with the motors and gear box assemblies at all. Once you learn how to program and address the VFDs for the motors, that is also a quick repair.
The new eight-point bearing assembly has held up well versus the old four-point style bearings.
The tech support for IntelliFinishing versus the other vendors on our system have been hands down the best. They answer the phone at all hours of the day or night, including weekends.
If there wasn’t a shot-blast system involved with this system, I’m positive this system’s drive tube, drive tube bearings and carrier bearing assemblies would last a lot longer than ours.”
(NOTE: The shot-blast issue addressed in this response haven’t been observed with other in-line shot blasts, and IntelliFinishing was able to provide lasting fixes for this customer.)
Process Design, Hydraulic Cylinder OEM, Nebraska, Liquid
“Coming from a long maintenance background, I, too, was concerned with all the moving parts. I was and still am a strong influence in (our company’s) decision-making, but my maintenance concerns were easily outweighed by all of the advantages that come with the IntelliFinishing conveyor.
The (company) demands of weight and density, along with a fixed footprint, challenged the conveyor weight capacity and forced the layout design to use a bias section of conveyor through our curing oven. We taxed the drive rollers and drive belts in the early days of startup. IntelliFinishing stuck to it, changing some gear ratios, powered corners, drive roller pressure, limit switch relocation and some frequency tweaks until the line was running smoothly.
It was thru this tune-up period that damage had been done to the drive spines, poly corners and quite a number or fractured drive rollers caused by the carrier stalls in the bias line oven.
It appeared my concerns of high maintenance were real, but (company) worked hard with IntelliFinishing to set up a solid maintenance program for the line. Not knowing just what to expect, we replaced all of the damaged parts and inspected everything on a regular basis.
We have been running steady now for nearly six years and, with a few small exceptions, drive belt inspection and tension is generally all we have to act on. This system runs so smooth, quiet and trouble-free that it’s easy to forget about, and we tend to take it for granted.”
The Power of IntelliFinishing
It’s evident from these testimonials that the IntelliFinishing difference extends far beyond the actual solutions themselves, and into the realms of service and maintenance.
To learn more about the IntelliFinishing system and our capabilities, visit www.intellifinishing.com.
Related posts
Search this blog
Get email updates
Archives
- May 2024
- April 2024
- August 2023
- May 2023
- April 2023
- March 2023
- June 2022
- May 2022
- April 2022
- November 2021
- October 2021
- September 2021
- April 2021
- March 2021
- January 2021
- October 2020
- August 2020
- June 2020
- May 2020
- February 2020
- January 2020
- December 2019
- October 2019
- September 2019
- June 2019
- May 2019
- March 2019
- February 2019
- October 2018
- September 2018
- August 2018
- July 2018
- June 2018
- May 2018
- April 2018
- March 2018
- July 2017
- June 2017
- May 2017
- April 2017
- March 2017
- February 2017
- December 2016
- June 2016
- May 2016
- April 2016
- February 2016
- January 2016
- September 2015
- June 2015
- March 2015
- February 2015
- January 2015
- December 2014
- November 2014
- August 2014
- June 2014
- May 2014
- April 2014
- August 2013
- July 2013
- March 2013
- October 2012
- September 2012
- March 2011
- February 2011
- January 2011
- October 2010